In October of 2019 AccuLine Underground began the 60″ installation in Metuchen, New Jersey. When working on a large diameter jobs, contractors are sure to run into obstacles. This job was no exception, but AccuLine’s trained crew followed protocol and used their resources to complete this job to precise specifications.
The AccuLine team endured rock, a flowing underground stream, and wet running sand through this high-risk utility crossing. Each obstacle faced the team with problems of its own making it difficult to predict what was going to happen next. Although these unforeseen conditions were encountered, AccuLine successfully completed the installation on the wanted line and grade proving that their experience and determination was more than enough to take on a large job such as this one.